Monday, September 21, 2015

Brick work in foundation


Brick work in foundation is done to transfer the load of super structure to the ground. The width of the brick work in foundation is taken according to the load coming on it. The load of super structure is divided into various steps of brick works in foundation below plinth level. Care may be taken that all steps should accommodate in the ground. The foundation should be made according to the drawing and design. Brick work above plinth level is called brick work in super structure. Brick work in super structure transfer the load of RCC beam and slabs to the foundation of the walls. Doors, windows and ventilators are accommodated in this part of brick work. This part of the building is used to divide the space into required room etc. Outer walls may be used for ornamental design of the building.

No comments:

Post a Comment